Part 3: Should You Build or Buy?

Part 3: Should You Build or Buy?

DIY vs Turnkey: An Honest Assessment

When it comes to getting a CNC plasma cutter into your workshop, you’ve got two main paths:

  • Buy a ready-made (turnkey) machine,
  • Build your own from scratch or from parts.

Each option has trade-offs — and the right choice depends on what you’re hoping to get out of the process.


Why You Might Buy a Turnkey System

  • Speed: If you need to start cutting parts next week, buying is the fastest way there.
  • Support: Most turnkey systems come with customer service, warranties, and setup help.
  • Simplicity: No wiring, no CAD models, no hunting down parts — just plug in, learn the software, and start cutting.

But you’ll pay for it — quality machines can easily start at £7,000–£15,000, and customisation is limited to what the manufacturer offers.


Why You Might Build Your Own

  • Customisation: Build a machine that fits your exact workshop needs — size, power, table type.
  • Cost Control: With careful planning, you can build a capable system for significantly less than a turnkey machine.
  • Learning: You’ll know every bolt, wire, and setting — which makes maintenance, upgrades, and troubleshooting much easier.
  • Satisfaction: There’s something super powerful about building your own tools.

However, building takes time, patience, and a fair amount of problem-solving — it’s not for everyone, and that’s okay.


Skills You’ll Need to Build

You don’t need to be an engineer, but it helps to be comfortable with:

  • Basic assembly or fabrication — depending which route you go down
  • Electrical wiring — safely connecting motors, drivers, power supplies,
  • Software setup — installing and configuring motion control software like LinuxCNC,
  • Problem-solving — things will go wrong; patience and adaptability matter.

You can learn most of these skills as you go — but expect a learning curve, and be prepared to spend time reading, tweaking, and troubleshooting.


Time and Cost Comparison

Buy Build
Cost £7,000–£15,000+ minimum £2,500–£6,000 (depends heavily)
Time to first cut Days to weeks (delivery/setup) 3–6 months (design, build, debug)
Customisation Limited to options available Fully customisable
Learning Curve Low (mostly software learning) High (mechanical, electrical, software)
Maintenance Service support available You are the service support

When It Makes Sense to Buy

  • You need a machine now for business or production.
  • You’re not interested in the technical side — you just want to cut metal.
  • You have the budget to invest upfront.
  • You prefer to have tech support and warranties.

When It Makes Sense to Build

  • You enjoy learning, building, and problem-solving.
  • You want to customise the machine to your specific space or needs.
  • Budget is tight and you’re willing to trade time for cost savings.
  • You want to really understand how the machine works for long-term ownership and maintenance.

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.